Skip to content
← All lessonsPilot lesson · educator review pendingGrades 9–10

Make the budgets close.

A spacecraft design is a set of promises that all have to be kept at once: enough power, enough storage, mass within limit, balance within tolerance. Your team will put two designs through the same mission and check every budget, not just the ones that pass.

Two designs, one mission. Which one actually closes every budget it has to?

Your role

Spacecraft configuration engineer

Objective

Evaluate two declared configurations against every modeled mission budget and choose which can proceed.

Success looks like

Compile both configurations, inspect every check, select evidence, and avoid presenting declared-input budgets as CAD or measured truth.

Learning outcomes · Grades 9–10

What you should be able to do, and the evidence that shows it.

  • 01By the end of this mission, the learner will be able to calculate whether each design generates more power than it draws at full load, and demonstrate this by reporting both figures with units.
  • 02By the end of this mission, the learner will be able to model why a design can pass its power check and still fail another, and demonstrate this by citing a check of each kind.
  • 03By the end of this mission, the learner will be able to test each design against its stated limits, and demonstrate this by naming every check that needs review.

Before we start

A quick check of what you already know. There is no score.

A design has plenty of spare power but exceeds its mass limit. What is the verdict?

The idea behind the mission

Two designs, the same mission. Each is checked against its own stated limits, and every check has to hold.

Every budget has to close

Spacecraft design is constrained on several axes at once. A design with generous power can still be stopped by mass, or balance, or storage. Engineers check each budget against a stated limit and treat any one that does not close as a blocker, however comfortable the others look.

Predict before you run

Before you run anything: which design do you expect to close every budget, and which check worries you most?

Which design will close every budget, and which check worries you most?

At least 20 characters — say what you expect and why.

Confirm mission readiness

This is a local preparation check. It is not Challenge qualification and creates no official attempt.

  • Mission objective and success criterion reviewed
  • Preparation diagnostic answered
  • Mission theory reviewed
  • Prediction recorded

Official qualification: false. This acknowledgement stays in this browser.

Configure the mission

These are the two set-ups you will compare. They are fixed on purpose: if only one thing differs between your runs, anything that changes was caused by it.

Baseline case

1U trainer design

Candidate case

3U engineering design

  • Write your prediction first.
  • Both designs face the same mission, so any difference is the design.
  • These budgets are computed from declared inputs. Nothing here is CAD truth or a measured subsystem.

Units stay attached to every result: angles in degrees (°), time in seconds (s), power in watts (W), energy in watt-hours (Wh), battery state in percent (%), and elevation in degrees (°) where available.

Run the Digital Twin

Compile the trainer design first, then the engineering design. The mission is identical.

Baseline

1U trainer design

Candidate

3U engineering design

Run the baseline first so you have something to compare against.

Read the evidence

Read every check, not the headline. One budget that does not close is enough to stop a design.

Run the Twin to produce evidence.

Make the engineering decision

Which configuration would you take forward, and which checks decided it?

Which configuration do you take forward, and what evidence supports it?

What this does not prove

What this mission shows

  • My prediction
  • The design-budget comparison for the two spacecraft
  • Where each number came from
  • One thing this model does not cover

What it does not establish

  • These budgets are computed from declared inputs, not measured from hardware.
  • This is not a CAD model and makes no claim about manufacturability.
  • This lesson does not establish that either design would work in orbit.

Name one thing this configuration study does not establish about a real spacecraft.

Show what you understood

Formative feedback for you and your teacher. There is no official grade.

A design passes its power check but fails its mass check. Is the design acceptable?

Which evidence tells you whether a design is viable?

Which configuration would you take forward, and which checks decided it?

Name one thing this configuration study does not establish about a real spacecraft.

Reflect and complete

Completion records the work you did; it does not mean mastery, qualification, or an official grade.

Which constraint bound first, and what would you change without breaking a different budget?

At least 20 characters. Editing this or any source work after completion invalidates the local record.

Revisit the mission evidence

Revisit the mission evidence

Formative · not an official grade

No formative evidence has been recorded yet.

Formative band: revisit. Any formative band may complete the mission. Official grade: none.

Finish the required run or comparison, select evidence, make a decision, answer the formative assessment, and complete your reflection.

Save and hand in

Keep a copy of the work stored in this browser, or send it to your teacher for review.

Finalize the mission to create a local-practice record on this device.